Investor: PKP PLK S.A.
Project description:
- track works: earth works on the track, delivery of a protective sandy gravel layer with embedded geofibre and a distributed reinforcing geogrid, slopes shielded with openwork panels, delivery of a lower semi-layer of rubble
- drainage works: delivery of drainage ditches reinforced with concrete gutters, underground passage
Period of delivery: 23rd July 2007 - 31st July 2008